Given:
Total number of bulbs = 200
Number of defective bulbs = 16
(i) Let A be the event of getting a defective bulb
Total number of defective bulbs = 16
So, P(getting defective bulbs) = P(A) = 16/200 = 2/25
(ii) Let B be the event of getting non-defective bulb
So, P(getting non-defective bulb) = P(B)
= 1 – P(A)
= 1 – 2/25
= 23/25.