Suppose you have three Jobs of which Jobs 1 and 2 are executed parallelly. Job 3 executes only after Jobs 1 and 2 complete their execution. Which of the following components can be used to set this up?

  1. tUnite
  2. tPostJob 
  3. tRunJob
  4. tParallelize

1 Answer

0 votes
by (1.8m points)

tPostJob & tParallelize