in Technology by
What is the N+1 SELECT problem in Hibernate?

1 Answer

0 votes
by
The N+1 SELECT problem is a result of lazy loading and load on demand fetching strategy. In this case, Hibernate ends up executing N+1 SQL queries to populate a collection of N elements. For example, if you have a List of N Items where each Item has a dependency on a collection of Bid object. Now if you want to find the highest bid for each item then Hibernate will fire 1 query to load all items and N subsequent queries to load Bid for each item. So in order to find the highest bid for each item your application ends up firing N+1 queries.

Related questions

0 votes
    How to solve the N+1 SELECT problem in Hibernate?...
asked Feb 4, 2021 in Technology by JackTerrance
0 votes
    In the TSP problem of n cities, the time taken for traversing all cities, without having prior knowledge of the length of the minimum tour will be_______. O(n) O(n2) O(n!) O(n/2)...
asked Mar 8, 2021 in Technology by JackTerrance
0 votes
    Problem: Select first N rows and last row in Python Pandas. only gets 1 row which is index 9 and ... JavaScript Questions for Interview, JavaScript MCQ (Multiple Choice Questions)...
asked Apr 7, 2022 in Education by JackTerrance
0 votes
    ____________ function can be used to select the random sample of size n' from a huge dataset. (a) ... Debugging of R Programming Select the correct answer from above options...
asked Feb 15, 2022 in Education by JackTerrance
0 votes
    I have this dataframe and trying to select the last n (=2) rows if the present value is True so I code as ... , I should select 50,40 Select the correct answer from above options...
asked Jan 8, 2022 in Education by JackTerrance
0 votes
    Facing issue in session with the upgrade of my application to Spring 4.1.9 and Hibernate 4.3.11.. ... JavaScript Questions for Interview, JavaScript MCQ (Multiple Choice Questions)...
asked Jun 14, 2022 in Education by JackTerrance
0 votes
    To retrieve the day of the month from the Date object, which is the code to select? var date_obj = new Date(2016 ... .getMonth(); d) var month_day = date_obj.getDate(); #Loans...
asked Oct 9, 2020 in Technology by JackTerrance
0 votes
    _____________ is a pictorial representation of the sequence of steps to solve a particular problem is called: Algorithm ... the above Select the correct answer from above options...
asked Dec 25, 2021 in Education by JackTerrance
0 votes
    A and B are two students. Their chances of solving a problem correctly are 1/3 and 1/4, respectively. If the ... 13/120 D. 10/13 Select the correct answer from above options...
asked Nov 19, 2021 in Education by JackTerrance
0 votes
0 votes
    The probabilities of A, B, C solving a problem are 1/3, 1/4 and 1/6, respectively. If all the three try ... one of them will solve it. Select the correct answer from above options...
asked Nov 16, 2021 in Education by JackTerrance
0 votes
0 votes
0 votes
    Probability of solving specific problem independently by A and B are `1/2`and `1/3`respectively. If both try ... solves the problem. Select the correct answer from above options...
asked Nov 13, 2021 in Education by JackTerrance
...